Ceiling almost finished!

BCEA412F-BE23-40B9-B8D1-CDAC3B8E520E

Look how bright the double room is now with the sheet rock up and ready to finish trimming out and painting. John and Ryan and I spent the last two days working as much as possible to get the ceiling in place. There was a lot of prep work to be done: finishing the insulation, spraying some foam insulation into cracks and crevices all over the place, and making sure there were no screws or nails or dried foam in the way of the sheet rock being raised into place. I only missed one little screw which created a little bubble when I hung that piece of ceiling. I had to cut into the bubble and will patch it later.

This time we rented a sheet rock raising tool to help us lift the large heavy Gypsum boards into place. I appreciated having the tool around for lifting the boards, fitting, and cutting them. It rented for $39 a day at Home Depot. We ended up using it for a day and a half.

I was able to work for three hours at a time and then I would have to take a break and have a snack or meal. I’m pretty happy about how much energy I had today. I was dripping with sweat and I felt so dirty when work was through but I feel blissful and tired after my shower, having accomplished so much.

2 responses to “Ceiling almost finished!”

  1. Beautiful work and exciting! Love it when a plan comes together..don’t you? It’s awesome you can rent that piece of equipment too. I know that made the process so much easier. Look forward to more progress updates.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: